Fire strategy cost: what a fire strategy report costs
Updated
A fire strategy is a design document for building work, not a check of an occupied building. It is priced on height, use and complexity; few consultancies publish a fee.
What a fire strategy report costs
Most fire engineering consultancies quote rather than publish. The one published range we read, on the Fire Risk Assessment Network's guide to fire strategy reports, gives these typical UK fee ranges (fire-risk-assessment-network.com):
| Building | Published fee range |
|---|---|
| Small commercial building | £1,500–£3,000 |
| Medium residential scheme | £3,000–£7,000 |
| Large or high-rise development | £7,000+ |
The same page states that costs vary depending on complexity, height and building use, and that performance-based fire engineering, smoke modelling or structural calculations will increase them. It is one source, not a market survey, so treat the bands as orientation and get quotes for your scheme.
Fire strategy or fire risk assessment: which one you are paying for
- Fire strategy
- Written at design stage for new building work, an extension or a change of use, to show how the building meets Part B of the Building Regulations: means of escape, compartmentation, fire detection and firefighting access. It is usually needed for Building Control approval.
- Fire risk assessment
- Carried out on a building once it is occupied, by or for the responsible person under the Regulatory Reform (Fire Safety) Order 2005, and kept under review. See what a fire risk assessment costs.
The two meet at handover. Regulation 38 of the Building Regulations 2010 covers erecting or extending a relevant building, or a relevant change of use (legislation.gov.uk).
There, "the person carrying out the work must give fire safety information to the responsible person" no later than completion or occupation. A good fire strategy is the backbone of that information, and the fire risk assessor works from it.
What moves the fee
- Height and use. A taller building or one where people sleep needs more of the strategy argued in detail.
- Prescriptive or engineered. Following the Approved Document B guidance closely is quicker than a performance-based design that departs from it.
- Modelling. Smoke or evacuation modelling, and structural fire calculations, are priced on top.
- Revisions. Each design change that affects escape or compartmentation means the strategy is reissued; ask how many revisions the fee includes.